|
|
Name of Project: Hangar C and D – Ben Gurion Airport
City: Lod
Contractor: Efocol Painting Services Ltd.
Painting Specifications:
General details: painting specifications were written by Corrosion Advisor, Michael Bar. Parts that were painted, 1,800 tons of construct parts. In view of the fact that this is a closed building in the central region of Israel that is not close to the sea, or in the vicinity of a heavy industrial zone, the specifications selected consist of a one layer system.
Painting specifications: one-layer system on 60-80 micron black steel polyester
|